Powered By Kitlog Pro v2.0
Jaco Swanepoel's KR2S Web Site
KR2S
Engine
11-26-2005
< Previous Log Entry
Next Log Entry >
Date:
11-26-2005
Number of Hours:
4.00
Manual Reference:
Brief Description:
Fuel Rail
I manufactured 4 sleeves on the lathe to fit over each injector. I machined steel T-pieces and silver soldered them to the sleeves. I then used 8mm steel brake pipe with compression fittings to make up the fuel rail.
Fuel Rail
Injector Sleeve
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
KR2S Home
All
Avionics
Ballistic Parachute
Canopy
Controls
Cowling
Empennage
Engine
Fuel Tanks
Fuselage
Instrument Panel
Interior
Under Carrige
Wings
KR2S Home
Copyright © 2001-2013 Matronics. All Rights Reserved.