Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-14A
All
3-5-2023
< Previous Log Entry
Next Log Entry >
Date:
3-5-2023
Number of Hours:
0.50
Manual Reference:
Brief Description:
Installed Fuel Vent Lines in the L&R Fuel Tanks
Installed the Fuel Vent Lines in the Left and Right Fuel Tanks after flaring the inboard ends for the AN-808 and 809 -4D Flared Nut and Flange.
Left Tank Flared Vent Line
Left Tank Flared Vent Line
Right Tank Vent Line Installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
395
3573
Aircraft Related
189
1351
Empennage
4
48
Fuselage
5
812
Miscellaneous
3
5
None
5
6
Wings
189
1351
RV-A8 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.