KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  2-24-2023
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Inspected Fuel Tanks for Sealant Coverage

Inspected Fuel Tanks for Sealant Coverage. Applied sealant as needed.

Discovered that I didn't create a filet on the forward edge of the Attachment Sub-assembly. This is blind side of the Attachment Bracket and I had to use inspection mirrors to verify a good filet formation. I am glad that I found this on inspection.

Cleaned sealant from the outside of the tank from the last installations. Usually, I clean up right after the work session but this time I was not able to do so. I expected to be back the next day to clean the sealant. This would not be much of a problem waiting one day. As it turned out, I missed yesterday and had to clean after two days setting. The Sealant came off OK but it required more work then if I had done it earlier. All of the tools are clean now.

Installed the left tank snap bushings for the vent line installation that I will be doing on the next session.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.