Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-14A
All
6-1-2022
< Previous Log Entry
Next Log Entry >
Date:
6-1-2022
Number of Hours:
2.00
Manual Reference:
Brief Description:
Fabricated the J-Channels for the Left Spar
Fabricated the J-Channels for the Left Spar. Cut to length the Short and Long Channels.
Drilled the Channels per instructions.
Deburred the holes and edges.
Put on the rack for use at a later date.
Desired J-channel gap
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
395
3573
Aircraft Related
189
1351
Empennage
4
48
Fuselage
5
812
Miscellaneous
3
5
None
5
6
Wings
189
1351
RV-A8 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.