Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-8A
Fuselage
11-5-2007
< Previous Log Entry
Next Log Entry >
Date:
11-5-2007
Number of Hours:
1.50
Manual Reference:
Brief Description:
Drilled the F-819 assembly
Drilled the F-819 assembly.
Clecoed the mid skins flush with the upper longeron.
Clecoed all of the upper holes of the F-804-N
Bolt holes drilled in F-812B
Drilling F-819 assembly
Mid skins flush to longeron
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8A Home
All
Avionics
Brakes
Canopy
Cooling System
Cowling
Electrical System
Empennage
Engine
Fiberglass
Finishing Kit
Flight Control Syste
Forward Baggage Comp
Forward Top Skin
Fuel System
Fuselage
Heating System
Interior
Landing Gear
Lighting
Miscellaneous
None
Oxygen System
Painiting
Painting
Prop
Sensors
Ventilation
Windscreen
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.