Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-8A
Fuselage
9-24-2007
< Previous Log Entry
Next Log Entry >
Date:
9-24-2007
Number of Hours:
8.00
Manual Reference:
Brief Description:
Primed aft bulkheads and riveted them together
Primed aft bulkheads (F-807/808/809/810B/811/812) and riveted them together.
Riveted the primed F-812A/F-812C/Tie Down Bracket together.
Drilled and deburred F-818B L&R Aft Baggage Angle and F-818 L&R and F-818D Bellcrank rib.
Assembled, drilled, deburred, converted, and primed the F-857B L&R Seat Belt Bracket, F-857D and F857E L&R Outbd and Inbd Seat Belt Brackets.
Riveted rear tie down bracket
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8A Home
All
Avionics
Brakes
Canopy
Cooling System
Cowling
Electrical System
Empennage
Engine
Fiberglass
Finishing Kit
Flight Control Syste
Forward Baggage Comp
Forward Top Skin
Fuel System
Fuselage
Heating System
Interior
Landing Gear
Lighting
Miscellaneous
None
Oxygen System
Painiting
Painting
Prop
Sensors
Ventilation
Windscreen
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.