Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-8A
Fuselage
11-27-2010
< Previous Log Entry
Next Log Entry >
Date:
11-27-2010
Number of Hours:
3.00
Manual Reference:
Brief Description:
Installed a Doubler for the Right Flap Fairing
Installed a Doubler for the Right Flap Fairing bottom rivets that were mis-drilled during the initial fitting.
Rerouted the tail light and elevator trim wires. Installed a split conduit around the wires.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8A Home
All
Avionics
Brakes
Canopy
Cooling System
Cowling
Electrical System
Empennage
Engine
Fiberglass
Finishing Kit
Flight Control Syste
Forward Baggage Comp
Forward Top Skin
Fuel System
Fuselage
Heating System
Interior
Landing Gear
Lighting
Miscellaneous
None
Oxygen System
Painiting
Painting
Prop
Sensors
Ventilation
Windscreen
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.