More wiring. Installed main fuse panel on a hinged door under panel. Ran more wires to fuse panel. Mounted ground tabs to firewall. Ran engine sensor grounds to ground tabs. Put one end on each engine ground cable so acccurate measurement can be made to cut cables to final length.