KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-16-2020
Number of Hours:  0.70
Manual Reference:  
Brief Description:  Grind down the buss bolts

I spent some time removing the buss bolts from the one block that was interfering with the removal of the smoke tank. I took them out and ground them down and then ran them back thru the 10-32 die - then re-inserted them. Some of them needed a double shot.
' style=

screws on the left of the picture have been ground down

screws on the left of the picture have been ground down

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.