Powered By Kitlog Pro v2.0
Jims RV-8
RV-8
Fuselage
9-29-2019
< Previous Log Entry
Next Log Entry >
Date:
9-29-2019
Number of Hours:
0.50
Manual Reference:
8-42
Brief Description:
A. Greasing the wheel bearings
Bob and I greased all 4 wheel bearings in preparation for the day that the wheels are installed on the landing gear and the landing gear will be installed on the fuselage.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1594
3157
Avionics
71
158
Baffles
7
25
Canopy
127
277
Cowling
11
25
Electrical
246
522
Empennage
139
331
Engine
51
63
Finishing
6
6
Firewall Forward
23
41
Fuselage
483
944
Lighting
20
35
Miscellaneous
36
13
None
34
Paint
2
4
Pre-build
7
Prop
2
1
Signings
7
Tools
3
Wheels, Brakes, Misc
50
102
Wings
269
610
Copyright © 2001-2024 Matronics. All Rights Reserved.