KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  1-14-2016
Number of Hours:  0.50
Manual Reference:  
Brief Description:  SS Cooling Ramp v2.1 #5

Tonight, I removed some of the excess metal on the aft end of cooling ramp so that the fit / flush will be a little better. I ended up using the manually cut end of the stainless for the aft end by mistake...but the cut wasn't too bad, so I just removed the extra and it lines up well now.

Next,,I drilled the aft holes in the cooling ramp. With careful measurements of the two outboard holes made, I drilled and then clecoed the aluminum cooling ramp in place and then I had a template to drill the remaining holes. Then it was deburring and dimpling to have one more set of holes made in the cooling ramp.
' style=

aft section of hole done

aft section of hole done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.