KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  1-10-2016
Number of Hours:  1.90
Manual Reference:  
Brief Description:  SS Cooling Ramp v2.1 #3

After measuring and thinking thru the best order to be able to make successive bends, I made the two side bends, and the front flange bend, You have to think thru the process to the end of the bends so as not to paint yourself into a corner. I also side clamped the bends so as to get a crisp 90 degree bend.
' style=

right side bend made and clamped

right side bend made and clamped

' style=

front flange bend after side bends

front flange bend after side bends

' style=

left side bend with clamp

left side bend with clamp

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.