KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  9-2-2014
Number of Hours:  1.50
Manual Reference:  8-22, 23
Brief Description:  Tailcone Bulkheads – misc bulkhead work

Since I had already separated the F811B-1 Stab attach bars – I trimmed the unneeded area out of the F-811A-1 and E-1 bulkheads, clecoed them together, final drilled the common holes, and then match drilled the holes in the bulkhead to the stab attach bar. Then I bent the flanges on the F-811A-1 so that they are parallel to the flanges on the F-811E-1 bulkhead. The parts were labeled, then disassembled, deburred, edged and set aside for priming.

I then did the same process to the F-810B-1 bulkhead and F-810C-1 angle (cleco together, final drill, disassemble, deburr, edge and set aside for priming).
' style=

shiny bulkheads and angles

shiny bulkheads and angles

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.