Not a lot of time tonight before the high school baseball game (playoffs) but I was able to seperate the F802H-1 and G-1 angles as well as flute the gear box assembly "walls". The walls are .040 thick so it takes some powerful fluting to get the part to lay flat...not a large flute between holes, but becuase the aluminum is so think - it takes a lot of muscle to get even a little flute. But it looks good.