KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  5-1-2014
Number of Hours:  0.70
Manual Reference:  8-4
Brief Description:  Landing Gear Box - prep work

Not a lot of time tonight before the high school baseball game (playoffs) but I was able to seperate the F802H-1 and G-1 angles as well as flute the gear box assembly "walls". The walls are .040 thick so it takes some powerful fluting to get the part to lay flat...not a large flute between holes, but becuase the aluminum is so think - it takes a lot of muscle to get even a little flute. But it looks good.
' style=

pre-flute (raised middle)

pre-flute (raised middle)

' style=

post-flute (flat part)

post-flute (flat part)

' style=

ready for edge deburring and further processing

ready for edge deburring and further processing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.