KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  4-17-2014
Number of Hours:  1.60
Manual Reference:  8-2
Brief Description:  Fuselage - match drilled

I cleco-ed up the parts on the firewall, turned it over and drilled the 1/8" rivet holes, 3/32" platenut rivet holes and the 2 @ 1/4" for the in-flight adjustable rudder pedals. It took a little longer because I had to keep flipping the firewall over to move clecos and then flip it back to drill from the front. But that's done now.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.