KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  4-10-2014
Number of Hours:  0.70
Manual Reference:  8-1
Brief Description:  Start working on the Fuselage

I needed some success tonight after the bad pushrod rivets, so I pulled out a few firewall parts and made today the official fuselage build beginning. I didn't do much, but that wasn't the point...I have begin.

I seperated the 8 spacers and smoothed the tabs off of them and the 3 firewall braces. Yep, that's about it. I can tell that the organization/storage of the fuselage parts is going to be a a bit of a problem until I use/connect enough parts. Being that I am space-limited, I have makeshift "stacks" of parts around the shop. Some are up in the upper storage, others in side/upper storage and some below the work benches. It doesn't sound too bad - but there are parts on top of parts and it makes finding specific parts more time consuming. Oh well, it is what it is...
' style=

spaceres disconnected and un-tabed

spaceres disconnected and un-tabed

' style=

stainless steel firewall...

stainless steel firewall...

' style=

me - smoothing spacers

me - smoothing spacers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.