I needed an easy task as it was near 100 in the shop tonight and I didn't feel up to a long work session, partly due to my mango-induced poison ivy issues... long story... SO.. I grabbed the conduit that skyking Bob donated to my build and started stringing it thru the wings...starting from the outside edge and working inboard so that I didn't have to pull it thru the four close wing walk ribs, because those are a pain to pull conduit thru!
It's been a long week at work so - I was glad to get out there and get something done - but I really need to do some research on the "Checkoway method" of drilling the fuel tank attach angles, because that's where I am in the steps... yep - on to the fuel tanks!