Date:  3-7-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Wing kit arrived today!

Yep - Like a Christmas present in March! The wings arrived today after being in Dallas at the main distribution hub in Dallas since Monday 3/4! The driver called me 30 minutes ahead of time and I was waiting... He was here and gone in 10 minutes - no big deal. The total weight is 399 lbs. but it didn't seem like they were that heavy. The driver helped me unload the boxes onto the mover dollies and then it was an easy rool up the driveway. I did the exterior inspection of the crates, paid the COD charge and thanked the driver! Done deal. Then I rolled the crates inside... I still had some work to get done so I left the crates alone - but later, I had to crack them open to see the cargo! Wow - Impressive packing job by Van's as usual! Next step...inventory!

I have been travelling a lot - which I expected...so the build will slow down for the next few months... don't worry, I will be cranking it back up...
' style=

off the truck

off the truck

' style=

in the garage/shop

in the garage/shop

' style=

open box 1 - incredible packing job!

open box 1 - incredible packing job!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.