KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  8-11-2018
Number of Hours:  1.00
Manual Reference:  6-14
Brief Description:  Vertical Stab glass tip

I installed the tip enclosure with a slurry and glass on the inside and then did the slurry fillet around the enclosure - it took two steps to let each section dry (install and then fillet) but I am combining here. I still need to sand it down.
' style=

still needs to be sanded, but otherwise done

still needs to be sanded, but otherwise done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.