Brief Description: Almost done with the Horizontal Stab
With "Led Zeppelin : Physical Graffitti" shuffling in the background, I bucked all the right side rivets to connect the forward spar to the skin and then it was on to the rear spar assembly and squeezing those rivets. I was able to get all but 28 rivets finished (had to drill out two offenders) as it was getting late and I need to change the yoke on the squeezer two more times to get the others. It won't be long now!