KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  6-12-2020
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Tooling process, Nut-torquer V2.0

I was going to need a way to get to nuts 2-4 by way of going over nut 1 and the others in sequence…so it was on to nut-torquer V2.0. I drilled a hole in the 3/8” socket, mixed up some JB Weld, inserted the rod into the hole in the socket and filled in the void with JB. I made sure to cover the hole in the bottom of the socket so as to keep the JB Weld where it needed to be. I used a small square of plastic sheet held in place with a nut inserted in the socket. This sounds real easy…and it is easy, but I had to drill out the hardened steel socket which took a few hours and a few drill bits.. and lots of boelube drilling oil.

I will let the JB Weld set up in the “tool” overnight.
' style=

this was after the tool was dry...

this was after the tool was dry...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.