KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  9-24-2019
Number of Hours:  17.00
Manual Reference:  
Brief Description:  Final electrical decision making and order prep

This log entry is covering the first 24 days of September and is a very conservative estimate of hours spent on finalizing the electrical architecture and determining what items are needed to support that architecture. Actual time spent could be as high as twice the hours I have listed – but it is what it is. I consulted with Rob in Virginia numerous times, spoke to Nathan at B and C Specialty numerous times, solicited opinions from Rob, Bob, Greg, Walt and others, poured over schematics, researched, read, looked up and sought education on all things electrical-homebuilt-aviation. I am by no means an expert, but I have learned a great deal and know much more than I did. I now have a plan as to what my electrical system will do and won’t do and I have a plan for building it.

I also helped out Greg with some canopy cutting and misc stuff this Saturday...I did n't realize he took our picture upside down :) I will have to fix that!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.