KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  8-18-2019
Number of Hours:  2.50
Manual Reference:  9-5
Brief Description:  Storage - latch and primer

I measured and drilled the corner holes for the canopy latch and then using the dremel cutting wheel, I cut along the lines between the holes - then files and smoothed the edges.

I installed the latch but there was a bit of a gap between the top of the latch and the bottom of the door - so I cut out a scrap piece of metal and drilled, dimpled, deburred and riveted it. I also added a stiffener to the door and then cleaned the storage assembly and then primered it. Now all it needs is paint and it will be done...but I will need to wait for more favorable temps.
' style=

Four holes and measurements

Four holes and measurements

' style=

latch installed

latch installed

' style=

primed and ready for paint

primed and ready for paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.