KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  5-18-2018
Number of Hours:  2.00
Manual Reference:  6-14
Brief Description:  Right tips

I got the tips installed tonight - first mixing up a slow slurry and spread it on the lead counterweight - I had to dimple some of the holes that were not yet dimpled. I also countersunk the holes in the fiberglass tips - got the final check fit done and then installed the tips. While the slurry was dryng I traded the clecos for pop rivets. The trailing edge hole on the bottom is awaiting a shorter rivet as there is not moch room back there. Othere than that one, I have installed the others.
' style=

elevator tip on

elevator tip on

' style=




' style=

on except for one trailing rivet

on except for one trailing rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.