KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  7-23-2016
Number of Hours:  3.80
Manual Reference:  6-2
Brief Description:  Horizontal Stab v2.0 Incl. SB, #3

- Dimpled the HS-702 spars and countersunk the HS-810-1 and HS-814-1 for flush rivets

- Notched the aft end of the HS-00006 ribs to fit around HS-814 and HS-810.

- Prepared the HS-00006, HS-00005, HS-706, HS-707 and HS-708 ribs by fluting and edge finishing

- Marked the hole locations on the centerline of the aft side of the aft flange of HS-00006. These holes attach HS-00006 to the forward spar assembly and HS-00005 and were the holes that I had problems with on v1.0 so I am making sure it is absolutely right. Pilot drilled the holes to #40.

- Drew a centerline on the forward side of the forward flange of HS-00005.

- Clecoed the left side HS-702, HS-603PP, HS-706, HS-707 and HS-708 together. Drilled all HS-706, HS-707, HS-708 rib to spar attach holes to #30.

- Un-clecoed, deburred holes, cleaned out chips and re-clecoed. Clecoed on the HS-801PP skin, enlarged the HS-708 to HS-603PP holes to #21.

- Clecoed the HS-00003, HS-810-1 and HS-814-1 to HS-702.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.