Not really sure how long I worked on the cooling ramp today but a half hour sounds about right. I laid out the measurements for the side holes and then drilled, deburred and dimpled them. Then I went back over the and smoothed the edges one more time and bent the overlapping edges on the side wings. I say she's done and I am happy with the results...time to move on.