KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  11-1-2015
Number of Hours:  6.20
Manual Reference:  6-3
Brief Description:  Horizontal stab rebuild - continued

Lots of work today - starting with the preparation of the ribs (smoothing and edging) and measuring and drilling the relief holes in the spars and then smoothing the relief holes out at the bend lines of the spars...clecoed the ribs to the front and rear spars and drilled them and deburred them then clecoed the skins on and tweaked around with the HS-00006 and HS-00005 (HS-404) ribs. Made the drill marks and drilled the 00005-00006 rivet holes on each side. Drilled the #40 holes to the skin spar / ribs / skin.
' style=

skins / spars / ribs drilled

skins / spars / ribs drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.