KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  8-23-2015
Number of Hours:  3.70
Manual Reference:  8-44
Brief Description:  Drilled landing gear mounting holes!

Well, we did it. Today was a BIG day as Bob and I got the landing gear drilled.

There were a total of four, 3/8" holes for the two outside attach brackets and four, 1/4" holes to hold on the outside wear plates. The holes were drilled thru the floor skin, the longeron that runs from the firewall to the tail and the steel weldment - so any error would be...well, really, really bad. We had everything measured up yesterday, but we ran thru the steps again today and re-measured and re-checked everything before drilling anything. The fore/aft measurement was right on, probably within 1/64th of an inch and the left/right measurement was at 1/32nd of an inch so I was good with that.

The first hole took much longer than the rest - as is always the case. Then after we got the eight holes drilled we removed everything and deburred it. We also drilled the 7/16" holes in the inboard wear plates and then reinstalled them under the gear and center punched the holes to be drilled for the inboard attach point. Big day - major milestone! Thanks Bob.
' style=

drilled 3/8

drilled 3/8" holes

' style=

happy campers - job well done

happy campers - job well done

' style=

2 sets drilled holes - just like the other side

2 sets drilled holes - just like the other side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.