KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-18-2008
Number of Hours:  1.00
Manual Reference:  33-2 to 33-6
Brief Description:  Baggage area parts

33-2

All steps this page completed as part of QB kit.

33-3
Step 1: Trimmed and deburred F 10100B and F 10100A shims

Step 2: Final drilled #40 and dimpled the F10100B shim and f 1026 Door seal channelthat are common to the F 1070L and F1073 L side skins.

Step3: Clecoed the Door seal channel and shim to F 1070 and 1073 skins. Clecoed the two end tabs on F1026 Door Channel Seal and F1006A Bulkhead and F1022A-L Baggage floor.

Step 4: Match drilled iboard hole and final drilled outboard hole in lower tab of F 1026 Seal Channel and F 1022A L Baggage Floor
Final driled the two holes in top tab of lower door seal channel and F 1006A Bulkhead.

Step 5:Trimmed F 1031 Upper baggage door seal.

Completed steps 6-10 per directions for the upper baggage door seal channel and close out panel on 33-3.

33-4
Step 2 Removed all parts clecoed in this section.

All other steps done per QB kit.

33-5
Completed steps 5,6,7 and 9 this page. Dimpling and countersinking the various parts called out in the instructions.

All other steps this page done per QB kit.


33-6

Step 1: Riveted nutplates to the F 1031 Upper Baggage Door Seal.

Quit here until wiring installed.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.