KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  10-18-2008
Number of Hours:  4.00
Manual Reference:  40. 6-8
Brief Description:  finish flap tube install

Finished installing flap control tubes and horn on right side and connecting to flap crank.

Mounted Flap motor and safety wired the extendable end to the flap crank bolt.

Mounted the FPS switch and actuator to the flap motor.

Mounted the FPS control box below the flap motor in tunnel.

Wired the flap motor and the FPS system at the flap motor.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.