Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Fuselage
7-9-2008
< Previous Log Entry
Next Log Entry >
Date:
7-9-2008
Number of Hours:
3.00
Manual Reference:
Sect 36
Brief Description:
Brake lines
36-2.
Step 1 drilled 5/8 holes in Fwd fuse bottom skin.
Step 2 Istalled the 45 elbows and nuts onto landing gear mounts
Step 3. Installed elbows washers and nuts to F-1048 Ribs.
Step 4. Made the brake lines fronm .032 x 1/4 tubing.
Step 5. snap bushings mounted. Also Nuts and sleeves.
Step 6. Ckecked for proper orientation, then flared ends. Installed Lines.
36-3
Step1. Removed Vent Ducts.
Step 2. Installed elbows nuts and washers to Tri-gear Brake Bracket.
Step 3. Made brake lines from .032 x 1/4 Tubing.
Step 4. Put 4 cushion clamps on each line along with nuts and sleeves.
Step 5. Checked orientation. Flared ends.
Step 6. Attached lines to appropriate fittings.
36-4
Step 1 & 2. Riveted the Vent Flanged Ducts back onto the F-1048 L & R Ribs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.