KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  7-9-2008
Number of Hours:  3.00
Manual Reference:  Sect 36
Brief Description:  Brake lines

36-2.
Step 1 drilled 5/8 holes in Fwd fuse bottom skin.

Step 2 Istalled the 45 elbows and nuts onto landing gear mounts

Step 3. Installed elbows washers and nuts to F-1048 Ribs.

Step 4. Made the brake lines fronm .032 x 1/4 tubing.

Step 5. snap bushings mounted. Also Nuts and sleeves.

Step 6. Ckecked for proper orientation, then flared ends. Installed Lines.

36-3
Step1. Removed Vent Ducts.

Step 2. Installed elbows nuts and washers to Tri-gear Brake Bracket.

Step 3. Made brake lines from .032 x 1/4 Tubing.

Step 4. Put 4 cushion clamps on each line along with nuts and sleeves.

Step 5. Checked orientation. Flared ends.

Step 6. Attached lines to appropriate fittings.

36-4
Step 1 & 2. Riveted the Vent Flanged Ducts back onto the F-1048 L & R Ribs.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.