KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  7-6-2008
Number of Hours:  4.50
Manual Reference:  Sect. 29
Brief Description:  Fuselage Side Skins

29-2 to 29-4
All steps completed per QB kit.

29-5:
Step 4. Removed the F-1006B Bulkhead from tailcone and checked for proper fit of bulhead and mid side Fuse. Skin. Had to make a couple minor adjustments to Mid Side Fuse. Skin.
All other steps on this page already complete per QB kit.

29-6 - 29-7
All steps completed per QB kit.

29-8
Had to remake the F-10100A & B Baggage Door Shims as the QB ones were in upside down. Dimples on wrong side of shims.
Redid steps 1,2 & 3.

29-9 to 29-14
All steps completed per QB kit.

29-15
All steps complete per QB kit, except Step 4. haven't decided on bushing size for wire runs from wings.

29-16 - 29-17
All steps complete per QB kit.

29-18
Steps 8 & 9: Final drilled nylon washers and installed hardware to install Vent Door Subassembly.
All other steps complete per QB kit.

29-19 - 29-22
All steps completed per QB kit. Except 29-20 blind riveted the Fwd Cabin Floor panels into place.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.