Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Ailerons
5-18-2008
< Previous Log Entry
Next Log Entry >
Date:
5-18-2008
Number of Hours:
1.60
Manual Reference:
21-1 - 21-8
Brief Description:
QB aileron completion L & R
Section 21 Complete
21-2. QB completed
21-3. Step 1. Clecoed the A-1006 Outboard Hinge bracket to the spar assembly.
Step 2. Final drilled the bracket through the doubler, spar and main rib spar.
Step 3. Removed and deburred parts.
Step 4. Clecoed then final drilled the A-1007 L & R Inboard hinge brackets on to aileron assembly. Removed and deburred parts.
21-4. QB Completed.
21-5 QB completed
21-6 QB completed
21-7 QB completed.
21-8 Step 1. Made (2) each of A-1012 and A- 1013 spacers
Step 2. Installed A-1007 L & R Inboard Hinge Brackets.
Step 3. Installed A-1006 Outboard Hinge Brackets
Finished with Section 21
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.