KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  12-23-2008
Number of Hours:  2.20
Manual Reference:  33-8/ 33-9
Brief Description:  baggage corrugations

33-8 Steps thru 33-9 steps 1-9 Clecoed then drilled the lower left baggage bulkhead corrugation to to the closeout panel and f1006 bulkhead. Match drilled the corrugation to the 1028 baggage bulkhead channel.
Match drilled the lower and upper baggage bulkhead corrugations. Match drilled the R. baggage cover. Dimpled nut plate holes for baggage cover, deburred parts and prepped cover for installation.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.