Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
All
10-14-2008
< Previous Log Entry
Next Log Entry >
Date:
10-14-2008
Number of Hours:
2.00
Manual Reference:
40. 2-5
Brief Description:
Flap control tubes
Prepped the flap control tubes and horns.
Drilled the horns and tubes per intructions in section 40
Primed the insides of the hoens and tubes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.