KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  10-14-2008
Number of Hours:  2.00
Manual Reference:  40. 2-5
Brief Description:  Flap control tubes

Prepped the flap control tubes and horns.
Drilled the horns and tubes per intructions in section 40

Primed the insides of the hoens and tubes.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.