KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  8-30-2008
Number of Hours:  3.00
Manual Reference:  OP 37-3 to 4
Brief Description:  circuit breakers and terminal block

OP 37-3
Step 3 and 4 Drilled holes for CB/ SCB using 801RT console Template as a guide.

Step 5 Installed SCB/CB as shown.

Planning on mounting flap switch in grip . Haven't mounted Flap Control Board Yet.

OP 37-4
Step 1 Made the Terminal block from the supplied UHMW material. Then assembled with the hardware called for.

Step 2 Attached Term Block to Sub Panel and drilled holes for Ground conn. on either side of term. block.

Step 3 Made the P21 and 22 Buss bars from supplied copper plate.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.