KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  10-22-2007
Number of Hours:  0.80
Manual Reference:  11-5
Brief Description:  Vertical Stabilizer Attach

Final Drilled the top two 3/16 holes in the rear spar doubler to #12.

Bolted the Vertical Stabilizer to the F 1012 Aft Fuselage Bulkhead Assembly. w/ AN3 bolts called for in Figure 6.

Final drilled the four remaining 3/16 holes #12, then machine countersunk the bottom two.

Istalled hardware called for in Figure 6.

Match drilled #30 then final drilled #12 as called for in Figure 5.

Removed and deburred all holes then assembled VS with hardware mentioned above.

All bolts torqued to 30 in/lbs.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.