KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  9-15-2007
Number of Hours:  1.50
Manual Reference:  10-18, 10-19
Brief Description:  Riveting Bulkheads and Frames

Riveted together the 1011 Bulkhead, Bulkhead Stiffener, Hor. Stab. Att. Bars and the Rudder Cable Angle
Riveted nut plates to Rudder Cable Angle
Riveted the Nut Plates for 824B Cover Plates to 1073 Skins
Riveted the Hor. Stab. Att. Angle to 1010 Bulkhead
Riveted together 1008 L&R Frames and the Rudder Cable Bracket
Installed Snap Bushings in Rudder Cable Bracket
Riveted the 1007 L&R Frames together
Installed Snap Bushings into 5/8 holes
Riveted the 1006 DBulkhead to the 1006A&C Bulkheads
1006B is riveted when Fuselage ia attached
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.