Brief Description: Preparing and manufacturing Parts
Clecoed 1012A & B bulkheads together Drew lines on Tie Down for alignment to Bulkheads and clamped together Match drilled the bulkheads for the Tie down Made Rudder Cable Angle from Stock Match drilled Nutplate holes in Rudder Cable Angle, then CS the rivet holes Made 1011A Bulkhead Stiffner from J Channel Pre loaded Hor. Stab. Attach. Bars and then Straightened Attached HSAB to 1011 Bulkhead and final drilled Centered 1011 Stiffner on 1011 assembly and clamped together then matched drilled Unibit 5/8 rudder cable holes Repeated above processes to locating and match drilling Rudder Cable Angle Made Horizontal Stabilizer Attach. Angle from stock Prepared 1010 Bulkhead and centered HSAA and clamped down and matched dsrilled Prepared 1008 l&R Bulkhead pieces(Deburred and Fluted as needed. Clecoed and then match drilled