KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  8-4-2007
Number of Hours:  5.50
Manual Reference:  10-2, 10-3
Brief Description:  Preparing and manufacturing Parts

Clecoed 1012A & B bulkheads together
Drew lines on Tie Down for alignment to Bulkheads and clamped together
Match drilled the bulkheads for the Tie down
Made Rudder Cable Angle from Stock
Match drilled Nutplate holes in Rudder Cable Angle, then CS the rivet holes
Made 1011A Bulkhead Stiffner from J Channel
Pre loaded Hor. Stab. Attach. Bars and then Straightened
Attached HSAB to 1011 Bulkhead and final drilled
Centered 1011 Stiffner on 1011 assembly and clamped together then matched drilled
Unibit 5/8 rudder cable holes
Repeated above processes to locating and match drilling Rudder Cable Angle
Made Horizontal Stabilizer Attach. Angle from stock
Prepared 1010 Bulkhead and centered HSAA and clamped down and matched dsrilled
Prepared 1008 l&R Bulkhead pieces(Deburred and Fluted as needed. Clecoed and then match drilled
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.