KitLog pro

Powered By Kitlog Pro v2.0

Greg's Model 12 Build
' style=
Date:  5-10-2019
Number of Hours:  1.00
Manual Reference:  
Brief Description:  1st layer of clear coat in drag wire holes

Swabbed all the holes, block faces and compression rib pass through areas that will be hard to reach after wires are installed. Took about 23cc on this inital coat.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.