KitLog pro

Powered By Kitlog Pro v2.0

Greg's Model 12 Build
' style=
Date:  4-8-2018
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Blowout repair

Filled in the blow out with as low of amperage as possible. Went pretty well. Ground down the excess with the tungsten burr. Ready for 2nd attempt at getting the last fairlead welded on. Received a foot of the 7/8 tubing to make the fairlead as I was out of the .049 stuff.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.