KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  3-12-2007
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Tank Prep

Mounted the clecoed tank and ribs to the spar, drilled the outside rib holes in the Z brackets. Removed the tank minus the outside ribs and the baffle and final drilled all the Z brackets holes matching with the baffle holes. This is a very accurate way of match drilling the holes for a perfect fit.
Next was to manufacture the joint plate W-423 so the tank and leading edge can be joined. As usual the process of alodining and priming was done.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.