Enlarged the holes in the fuselage for the flap rod entry, I need to connect up the flap motor and check for up and down. Crawled under the fuselage and after measuring 3" in from where I had originally marked 3 out on the wings I drilled the holes which will have screws connecting the wings and the bottom of the fuselage together. Made the fuel vent lines connecting from the tanks to the fuslage and made the main fuel line bend on the right tank which has the flop tube fitting. I have to order a union joint to connect the lines together.