KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  4-23-2007
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Hinges and Braces

I wanted to get the right wing up to the same stage as the left, so all the flap and aileron braces were prepared, corrosion proofed and fitted. I also finished and installed the aileron brackets, everything primed and finished. I had the day off from work so it was good to get a lot done, a very productive day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.