KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  7-11-2010
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Canopy Fairing

Lots and lots of canopy work, I have included a fews hours on and off in this log. Drilled and prepared the canopy with the inside side skirts and reinforcing skirt. I drilled the enlarged holes through the canopy with have a screw and nut attached. I though fuel tanks were bad, canopy's are worse. I am being very fussy (surprise, surprise) with the canopy,so lots of on/off on/off to get the skirting right. I had to cut the skirt a bit where it wasn't quite right, and glass over this section. So took a slither out and glassed underneath for strength, sanded the top smooth as it had a slight bulge.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.