Date:  11-28-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  installed welded bellcrank

Finished tack-welding transition bellcrank and installed in fuselage. ran cables from control stick to transition bellcrank and from bellcrank to elevator
' style=

transition bellcrank installed

transition bellcrank installed

' style=

cables installed on control stick

cables installed on control stick

' style=

from transition to elevator

from transition to elevator