KitLog pro

Powered By Kitlog Pro v2.0

PAUL'S WEB SITE
' style=
Date:  11-21-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  fairleads and bellcranks

Today I fabricated the transition bellcranks for the elevators. Also. I fabricated the fairleads where the lower elevator cables exit the fuselage between the stringers.
' style=

left fairlead

left fairlead

' style=

rightfairlead

rightfairlead

' style=

elevator bellcranks

elevator bellcranks

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.