Brief Description: Static Line Routing and Side Skins
Completed steps 3 & 7 page 10-09 – routing of static port lines. Installed with blue RTV at static ports. Started step 2 page 10-10. – installing F-1279L side skin. Question about why the bottom edge of the skin was not called out to be broken where they meet the F-1280 skins as it was not called out to do in step 2 page 10-02. Stopped to check online VAF forum to see if question had been asked previously.