Completed steps 9 and 10 page 06-02. Riveted upper and lower hinge assemblies. Used ATS C frame pneumatic squeezer. It took some experimentation and calculation to determine the proper spacing of the dies on the C frame unit. Having never done this before I wanted to proceed with caution. I practiced with several on some scrap material and then moved to the real parts. Everything worked very well and the rivets were checked with rivet gauge and found to be just right. The ATS tool works very well once adjusted. It is a little bulky and heavy to maneuver but with practice I am sure it will continue to work very well. Finally I have some parts that look functionall