KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  2-4-2021
Number of Hours:  3.50
Manual Reference:  24iS/U-02/03
Brief Description:  Roll bar assembly

Completed step 16 page 24iS/U-02

Step 16: Riveted along the flanges of the Roll Bar Assembly, start at the center and moved outwards. Periodically checked for flatness across the forward face of the Roll Bar Assembly and adjust as required

Completed steps 1-3 and 5 page 24iS/U-03

Step 1: Clecoed the C-01205A Canopy Block Drill Template onto the bottom of the Roll Bar Assembly as shown in Figure 1.
Step 2: Match-Drilled #30 the indicated hole of the C-01205A into the Roll Bar Assembly being sure to drill perpendicular to the surface. Removed the C-01205A and deburred the hole.
Step 3: Machine countersunk and then riveedt the three holes in the Roll Bar Assembly for the flush head rivets called-out in Figure 1.
Step 5: Installed the dome head rivet in the hole indicated in Figure 2
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.